Bicycle Electric Lifting System
Motorised lifting column with a quick-release clamp that sets a bicycle at the ideal working height in seconds — controlled from the handpiece or the foot pedal.
Heavy-duty alloy double leg kickstand for E-bikes and heavy bikes — two legs spread to 400 mm, 60 kg max load, covering 24" to 29" wheels at 1020 g.

The CDK08 is the heavy-duty double leg kickstand of the range, built for E-bikes and heavy bikes. Two legs spread up to 400 mm for a wide, planted base and carry a maximum load of 60 kg, covering 24", 26", 700C, 28" and 29" wheels.
Two legs spread to a maximum of 400 mm — a wide, planted base for heavy E-bikes and cargo builds.
Maximum load 60 kg: the strongest stand in the CDK range.
Covers 24", 26", 700C, 28" and 29" wheels. 1020 g. Powder coating black.

| Item no. | CDK08 |
|---|---|
| Description | Alloy double leg kickstand — for E-bikes and heavy bikes |
| Legs | Two legs, max 400 mm |
| Max load | 60 kg |
| Bike size | 24" / 26" / 700C / 28" / 29" |
| Weight | 1020 g |
| Color | Powder coating black |
| Packing | Confirm with order |
Specifications are typical values for the standard configuration. Custom materials, ranges and certifications are available on request — talk to an application engineer for a tailored datasheet.
Every unit ships with a 24-month parts-and-labour warranty covering manufacturing defects and premature component wear.
A stocked central spares warehouse guarantees critical-part dispatch within 24 hours to 40+ countries.
Our field engineers supervise on-site setup, alignment and first-run calibration, then hand over a signed commissioning report.
Customers who selected this product typically combine it with the following items.
A few things customers ask us most often during selection and ordering.
Ask a Different QuestionYes. Colours, finishes, packaging, private-label branding and market-specific certification are all available. Lead time typically increases by two to three weeks for custom configurations.
Standard catalogue products ship in three to five weeks from a confirmed purchase order. Stocked items are available within five working days from our warehouse.
We commit to a minimum of ten years of spare-parts availability measured from the date the last unit of a series ships. Consumable kits are held in stock at our central warehouse for the full period.
Yes. We produce for a number of international brands — your logo, your packaging and your colour, on our production line. Minimum quantities apply; ask for details.
Yes. Our team covers 42 countries with remote video support and, for larger accounts, on-site visits. Every order ships with assembly instructions, a spare-parts list and a named contact.
Send the products and quantities you need. We will return a priced quotation with packaging details and lead time.